Production Planning

Planning production in a joinery shop that actually works.

Capacity, scheduling, WIP and bottleneck elimination — for shops that build custom kitchens, wardrobes and shopfits, not identical widgets.

  • The weekly planning rhythm every joinery shop needs

    A one-hour Monday meeting that keeps the whole factory pointed the right way for the week.

    Rhythm 7 min read
  • Capacity vs load: knowing when to say no

    How to measure real capacity and spot commitment overload before you promise a delivery date.

    Capacity 9 min read
  • Mapping the bottleneck in your factory (it moves)

    Bottlenecks migrate. Here's how to find today's and plan for next month's.

    Throughput 8 min read
  • Priority triage without a shouting match

    A simple three-lane system that ends the ops-vs-sales priority argument for good.

    Prioritisation 6 min read
  • Buffer management: protecting the promise date

    Where to hold safety time — and how much — to keep delivery dates trustworthy.

    Scheduling 10 min read
  • The job kickoff checklist that prevents 80% of production issues

    The 12 items every job needs confirmed before it hits the saw.

    Kickoff 8 min read

More long-form articles publishing weekly. Subscribe from the footer to be notified.